13. 6. 2019

INFORMATION ON NPP TEMELÍN 110 / 2019

Both Unit 1 and 2 are in operation at planned power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output – 1068 MWe
  • Electricity production since the beginning of the year: 2 668 222 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1075 MWe
  • Electricity production since the beginning of the year: 4 249 503 MWh