12. 6. 2018

INFORMATION ON NPP TEMELÍN 112 / 2018

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output – 1069 MWe
  • Electricity production since the beginning of the year: 2 628 201 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1076 MWe
  • Electricity production since the beginning of the year: 4 230 036 MWh

  

Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín