Unit 2 is in the operation on the power effect. (https://www.cez.cz/cs/pro-media/tiskove-zpravy/druhy-blok-temelina-planovane-pozvolna-snizuje-vykon-odstavka-pro-vymenu-paliva-zacne-v-zaveru-tydne-87065).
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1082 MWe
- Electricity production since the beginning of the year: 2 452 027 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output - 1037 MWe
- Electricity production since the beginning of the year: 4 227 316 MWh