19. 6. 2019

INFORMATION ON NPP TEMELÍN 114/2019

Both Unit 1 and 2 are in operation at planned power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output - 1060 MWe
  • Electricity production since the beginning of the year: 2 821 267 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1067 MWe
  • Electricity production since the beginning of the year: 4 404 308 MWh