19. 6. 2024

INFORMATION ON NPP TEMELÍN 117 / 2024

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1074 MWe
  • Electricity production since the beginning of the year: 2 547 803 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1073 MWe
  • Electricity production since the beginning of the year: 4 420 905 MWh