21. 6. 2021

INFORMATION ON NPP TEMELÍN 119 / 2021

Both Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1067 MWe
  • Electricity production since the beginning of the year: 2 939 225 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1071 MWe
  • Electricity production since the beginning of the year: 4 483 592 MWh