22. 6. 2023

INFORMATION ON NPP TEMELÍN 120 / 2023

Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1069 MWe
  • Electricity production since the beginning of the year: 2 892 061 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1075 MWe
  • Electricity production since the beginning of the year: 4 478 093 MWh