10. 7. 2008

Information on NPP Temelín 134 / 2008

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on July 10, 2008 at 8:30 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1014 MWe
  • Electricity production since the beginning of the year:  3 962 724 MWh

Information on parameters at Unit 2 today on July 10, 2008 at 8:30 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1010 MWe
  • Electricity production since the beginning of the year: 3 221 420 MWh

  

Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín