1. 8. 2007

Information on NPP Temelin 149 / 2007

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

Information on parameters at Unit 1 today on August 1, 2007 at 09:30 o‘clock:

·      Unit is in Mode 1 - power operation 

·      Reactor power is 97 %

·      Turbine generator output - 981 MWe

·      Electricity production since the beginning of the year: 2 897 915 MWh

Information on parameters at Unit 2 today on August 1, 2007 at 09:30 o‘clock:

·      Unit is in Mode 1 - power operation

·      Reactor power is 100 %

·      Turbine generator output - 1011 MW

·      Electricity production since the beginning of the year: 3 423 517 MWh

Ing. Marek Sviták

Spokesman of the CEZ Group

Temelín NPP