8. 8. 2023

INFORMATION ON NPP TEMELÍN 151 / 2023

Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1085 MWe
  • Electricity production since the beginning of the year: 4 111 047 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1093 MWe
  • Electricity production since the beginning of the year: 5 643 428 MWh