29. 8. 2006
Information on NPP Temelín 169/2006
Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel.
· Unit is in Mode 1 - power operation
· Reactor power is 90 %
· Turbine generator output - 906 MWe
· Electricity production since the beginning of the year: 3 753 273 MWh Information on parameters at Unit 2 today on August 29, 2006 at 07:00 o‘clock:
· Unit is in Mode 6
· Reactor power is 0 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 4 609 632 MWh Milan Nebesář
Spokesman of the Temelín NPP