Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on October 5, 2017 at 8:30 o‘clock:

  • Unit is in operation
  • Turbine generator output - 1080 MWe
  • Electricity production since the beginning of the year: 7 184 876 MWh

Information on parameters at Unit 2 today on October 5, 2017 at 8:30 o‘clock:

  • Unit is in operation
  • Turbine generator output - 1088 MWe
  • Electricity production since the beginning of the year: 5 327 563 MWh

  

Marek Sviták
Spokesman of the ČEZ Group