15. 10. 2007

Information on NPP Temelín 201 / 2007

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

Information on parameters at Unit 1 today on October 15, 2007 at 11:00 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1011 MWe
  • Electricity production since the beginning of the year: 3 355 454 MWh

Information on parameters at Unit 2 today on October 15, 2007 at 11:00 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1010 MW
  • Electricity production since the beginning of the year: 5 210 398 MWh

Ing. Marek Sviták
Spokesman of the CEZ Group
Temelín NPP