19. 10. 2007

Information on NPP Temelín 205 / 2007

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

Information on parameters at Unit 1 today on October 19, 2007 at 8:45 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1013 MWe
  • Electricity production since the beginning of the year: 3 452 515 MWh

Information on parameters at Unit 2 today on October 19, 2007 at 8:45 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1010 MW
  • Electricity production since the beginning of the year: 5 307 440 MWh

Václav Brom
Spokesman of the CEZ Group
Temelín NPP