25. 10. 2021

INFORMATION ON NPP TEMELÍN 206 / 2021

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1099 MWe
  • Electricity production since the beginning of the year: 6 213 586 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1102 MWe
  • Electricity production since the beginning of the year: 6 056 681 MWh