INFORMATION ON NPP TEMELÍN 210 / 2019

Both Unit 1 and 2 are in operation at planned power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output - 1080 MWe
  • Electricity production since the beginning of the year: 6 380 132 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1088 MWe
  • Electricity production since the beginning of the year: 6 686 198 MWh

  

Marek Sviták
Spokesman of the ČEZ Group