1. 11. 2017

INFORMATION ON NPP TEMELÍN 212 / 2017

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on November 1, 2017 at 9:45 o‘clock:

  • Unit is in operation
  • Turbine generator output - 1087 MWe
  • Electricity production since the beginning of the year: 7 883 127 MWh

Information on parameters at Unit 2 today on November 1, 2017 at 9:45 o‘clock:

  • Unit is in operation
  • Turbine generator output - 1096 MWe
  • Electricity production since the beginning of the year: 6 631 344 MWh

  

Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín