7. 11. 2018

INFORMATION ON NPP TEMELÍN 218 / 2018

Both Unit 1 and 2 are in operation at planned power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output - 1082 MWe
  • Electricity production since the beginning of the year: 6 443 177 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1088 MWe
  • Electricity production since the beginning of the year: 6 334 662 MWh

 

Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín