9. 11. 2006
Information on NPP Temelín 220/2006
Unit 1 is in operation on planned power level. At Unit 2, the technicians carry on the equipment preparations for the Unit start after the refueling.
· Unit is in Mode 1 - power operation
· Reactor power is 96 %
· Turbine generator output - 972 MWe
· Electricity production since the beginning of the year: 5 320 556 MWh Information on parameters at Unit 2 today on November 9, 2006 at 07:00 o‘clock:
· Unit is in Mode 3
· Reactor power is 0 %
· Turbine generator output - 0 MWe
· Electricity production since the beginning of the year: 4 609 632 MWh Milan Nebesář
Spokesman of the Temelín NPP