16. 11. 2018

INFORMATION ON NPP TEMELÍN 225 / 2018

Both Unit 1 and 2 are in operation at planned power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output - 1089 MWe
  • Electricity production since the beginning of the year: 6 677 687 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1099 MWe
  • Electricity production since the beginning of the year: 6 570 659 MWh

 

Petr Šuleř
Head of Nuclear Communication Department
ČEZ Group