23. 11. 2007

Information on NPP Temelín 230 / 2007

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

Information on parameters at Unit 1 today on November 23, 2007 at 9:15 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1005 MWe
  • Electricity production since the beginning of the year: 4 274 119 MWh

Information on parameters at Unit 2 today on November 23, 2007 at 9:15 o‘clock:

  • Unit is in Mode 1 - power operation
  • Reactor power is 100 %
  • Turbine generator output - 1010 MW
  • Electricity production since the beginning of the year: 6 158 264 MWh

 

Ing. Marek Sviták
Spokesman of the CEZ Group
Temelín NPP