29. 11. 2023

INFORMATION ON NPP TEMELÍN 230 / 2023

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1105 MWe
  • Electricity production since the beginning of the year: 7 065 105 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1090 MWe
  • Electricity production since the beginning of the year: 7 278 538 MWh