According to the plan Unit 1 operates in the power effect of reactivity mode. The Unit 2 in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output (29.11., 9:45) - 1050 MWe
  • Electricity production since the beginning of the year (28.11., 24:00): 8 614 067 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output (29.11., 9:45) - 1091 MWe
  • Electricity production since the beginning of the year (28.11., 24:00): 6 766 769 MWh

  