3. 12. 2021

INFORMATION ON NPP TEMELÍN 233 / 2021

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1096 MWe
  • Electricity production since the beginning of the year: 7 241 693 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1102 MWe
  • Electricity production since the beginning of the year: 7 089 112 MWh