6. 12. 2023

INFORMATION ON NPP TEMELÍN 235 / 2023

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1103 MWe
  • Electricity production since the beginning of the year: 7 250 798 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1093 MWe
  • Electricity production since the beginning of the year: 7 462 225 MWh