22. 12. 2023

INFORMATION ON NPP TEMELÍN 247 / 2023

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1101 MWe
  • Electricity production since the beginning of the year: 7 674 580 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1091 MWe
  • Electricity production since the beginning of the year: 7 881 627 MWh