29. 12. 2017

INFORMATION ON NPP TEMELÍN 250 / 2017

Unit 1 is in the planned outage for refuelling. Unit 2 is in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the planned outage
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 8 853 135 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1092 MWe
  • Electricity production since the beginning of the year: 7 547 530 MWh