10. 2. 2023

INFORMATION ON NPP TEMELÍN 30 / 2023

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1100 MWe
  • Electricity production since the beginning of the year: 1 058 099 MWh

 

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output - 1101 MWe
  • Electricity production since the beginning of the year: 1 057 516 MWh