Information on NPP Temelín 58 / 2008

Unit 2 is in operation at planned power level. At Unit 1, the several-day outage is under way. The auxiliary systems of the power plant are working in accordance with the operation needs.

Information on parameters at Unit 1 today on March 21, 2008 at 09:30 o‘clock:

  • Unit is in Mode 6
  • Reactor power is 0 %
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 1 886 508 MWh

Information on parameters at Unit 2 today on March 21, 2008 at 09:30 o‘clock:

  • Unit is in Mode 1 - power operation 
  • Reactor power is 100 %
  • Turbine generator output - 995 MWe
  • Electricity production since the beginning of the year: 1 859 075 MWh

 

Marek Sviták
Spokesman of the ČEZ GROUP