9. 4. 2018

INFORMATION ON NPP TEMELÍN 67 / 2018

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output - 1087 MWe
  • Electricity production since the beginning of the year: 980 748 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1087 MWe
  • Electricity production since the beginning of the year: 2 5666 603 MWh

 

Marek Sviták
Spokesman
Nuclear Power Plant Temelín