11. 1. 2006
Information on NPP Temelín 8 / 2006
The first Units is operated at a planned power level. Unit 2 is shutdown as planned for the replacement of the high pressure turbine rotor. All auxiliary systems are working in accordance with the operation needs of individual units.
· Unit is in Mode 1 - power operation
· Reactor power is 97%
· Turbine generator output - 980 MW
· Electricity production since the beginning of the year: 247 740 MWh Information on parameters at Unit 1 today on January 11, 2006 at 07:15 o‘clock:
· Unit is in Mode 6
· Reactor power is 0%
· Turbine generator output - 0 MW
· Electricity production since the beginning of the year: 54 079 MWh Milan Nebesář
Spokesman of the Temelín NPP