24. 4. 2007
Information on NPP Temelín 82/2007
Both Unit 1 and 2 are in operation at full rated power.
· Unit is in Mode 1 - power operation
· Reactor power is 97 %
· Turbine generator output - 981 MWe
· Electricity production since the beginning of the year: 638 791 MWh Information on parameters at Unit 2 today on April 24, 2007 at 7:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 100 %
· Turbine generator output - 1012 MW
· Electricity production since the beginning of the year: 2 711 541 MWh Ing. Milan Nebesář
Spokesman of the CEZ Group
Temelín NPP