Both Unit 1 and 2 are in operation at full rated power.

April 30, 2007

All auxiliary systems of the power plant are in operation in accordance with the operational needs of the units.

Information on parameters at Unit 1 today on April 30, 2007 at 8:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 97 %
· Turbine generator output - 981 MWe
· Electricity production since the beginning of the year: 742 861 MWh

Information on parameters at Unit 2 today on April 30, 2007 at 8:00 o‘clock:
· Unit is in Mode 1 - power operation
· Reactor power is 99 %
· Turbine generator output - 1010 MW
· Electricity production since the beginning of the year: 2 857 335 MWh