Information on parameters at Unit 1:
- Unit is in the planned outage
- Turbine generator output – 0 MWe
- Electricity production since the beginning of the year: 2 213 479 MWh
Information on parameters at Unit 2:
- Unit is in operation
- Turbine generator output - 1092 MWe
- Electricity production since the beginning of the year: 3 403 283 MWh