14. 5. 2018

INFORMATION ON NPP TEMELÍN 90 / 2018

Both Unit 1 and 2 are in operation at full rated power. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in operation
  • Turbine generator output – 1075 MWe
  • Electricity production since the beginning of the year: 1 881 986 MWh

Information on parameters at Unit 2:

  • Unit is in operation
  • Turbine generator output - 1080 MWe
  • Electricity production since the beginning of the year: 3 478 804 MWh

  

Marek Sviták
Spokesman of the ČEZ Group
Nuclear Power Plant Temelín