16. 5. 2008

Information on NPP Temelín 95 / 2008

Unit 1 is in operation at planned power level. At Unit 2, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1 today on May 16, 2008 at 07:30 o‘clock:

  • Unit is in Mode 1 - power operation 
  • Reactor power is 100 %
  • Turbine generator output - 1012 MWe
  • Electricity production since the beginning of the year: 2 658 532 MWh

Information on parameters at Unit 2 today on May 16, 2008 at 07:30 o‘clock:

  • Unit is in Mode 6 
  • Reactor power is 0 %
  • Turbine generator output - 0 MWe
  • Electricity production since the beginning of the year: 2 967 592 MWh

 

Václav Brom
Spokesman of the ČEZ GROUP
Temelín NPP