Nuclear Power Plant news pg. 123
INFORMATION ON NPP DUKOVANY 1/7/2022
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 484 226 256 MWh.
1. 7. 2022
INFORMATION ON NPP DUKOVANY 30/6/2022
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 484 191 815 MWh.