Nuclear Power Plant news pg. 127
INFORMATION ON NPP DUKOVANY 9/6/2022
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 483 459 186 MWh.
9. 6. 2022
INFORMATION ON NPP DUKOVANY 8/6/2022
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 483 424 156 MWh.