Nuclear Power Plant news pg. 35
Information on NPP DUKOVANY 11/12/2023
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 505 388 819 MWh.
11. 12. 2023
Information on NPP DUKOVANY 8/12/2023
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 505 281 020 MWh.