Nuclear Power Plant news pg. 40
Information on NPP DUKOVANY 10/11/2023
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 504 276 119 MWh.
10. 11. 2023
Information on NPP DUKOVANY 9/11/2023
Units 1, 2, 3 are in the operation. Unit 4 is in the planned outage for refuelling. Electricity production since the beginning of the operation: 504 240 300 MWh.