Nuclear Power Plant news pg. 1107
Information on NPP Temelín 160 / 2007
At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. Unit 2 is in operation at planned power level. All auxiliary systems are working in accordance with the operation needs of individual units.
16. 8. 2007
Information on NPP Temelín 158 / 2007
At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. Unit 2 is in operation at planned power level. All auxiliary systems are working in accordance with the operation needs of individual units.
14. 8. 2007
Information on NPP Temelín 157 / 2007
At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. Unit 2 is in operation at planned power level. All auxiliary systems are working in accordance with the operation needs of individual units.
13. 8. 2007
Information on NPP Temelín 156 / 2007
At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel. Unit 2 is in operation at planned power level. All auxiliary systems are working in accordance with the operation needs of individual units.