Nuclear Power Plant news pg. 1137
Information on NPP Temelín 29/2007
Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel.
9. 2. 2007
Information on NPP Temelín 28/2007
Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of ¼ of the reactor fuel.