Nuclear Power Plant news pg. 1167

JE Temelin traffic

Information on NPP Temelín 147/2006

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel.

31. 7. 2006

JE Temelin traffic

Information on NPP Temelín 146/2006

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel.

28. 7. 2006

JE Temelin traffic

Information on NPP Temelín 145/2006

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel.

27. 7. 2006

JE Temelin traffic

Information on NPP Temelín 144/2006

Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel.

26. 7. 2006