Nuclear Power Plant news pg. 1204
Information on NPP Temelín 249/2005
Unit 1 is shut down to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.
23. 12. 2005
Information on NPP Temelín 248/2005
Unit 1 is shut down to repair the electric magnet in one of the pumps. Unit 2 is in operation at a planned output.