JE Dukovany traffic

Information on Dukovany NPP, December 18th 2006

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 265 338 653 MWh.

18. 12. 2006

JE Temelin traffic

Information on NPP Temelín 246 / 2006

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.

15. 12. 2006

JE Dukovany traffic

Information on Dukovany NPP, December 14th 2006

Units 1,2,3,4 are operated at full rated power. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 265 207 092 MWh.

14. 12. 2006

JE Temelin traffic

Information on NPP Temelín 244 / 2006

Both Unit 1 and 2 are in operation at full rated power. All auxiliary systems are working in accordance with the operation needs of individual units.

13. 12. 2006