Nuclear Power Plant news pg. 2525
Information on NPP Temelín 124/2006
Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel.
27. 6. 2006
Information on NPP Temelín 123/2006
Unit 2 is in operation at planned power level. At Unit 1, a planned outage is under way, that is connected with the annual refueling of 1/4 of the reactor fuel.