ČEZ, a. s., concluded a contract for the construction of a waste-to-energy facility (WTE) in the Mělník power plant location with the supplier selected in the procurement procedure according to the Public Procurement Act, which was an association of shareholders from the Metrostav Group, the company Metrostav DIZ, s. r. o., and Subterra, a. s. The selected supplier will carry out the contract based on the tender conditions as a so-called "turn-key" supply in the form of an EPC project. The value of the contract is 507.48 million euros.