4. 12. 2008

Information on Dukovany NPP, December 4th 2008

Units 1, 2 a 3 are operated at full rated power. Unit 4 is in planned outage. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 292 983 877 MWh.

Information on parameters of Unit 1-4, today on December 4th 2008 at 7:00 hrs:

Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 468 MWe

Unit 2is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 463 MWe

Unit 3is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 457 MWe

Unit 4is in Mode 6 – total fuel removal from reactor core

 

Electricity production since the beginning of the year: 13 279 577 MWh.