Information on parameters of Unit 1-4, today on February 19th 2008 at 7:00 hrs:
Unit 1 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 462 MWe
Unit 2 is in Mode 1 – power conditions: Reactor power is 98,5 %, Turbine generator output – 437 MWe
Unit 3 is in Mode 5 – cold shutdown
Unit 4 is in Mode 1 – power conditions: Reactor power is 100 %, Turbine generator output – 460 MWe
Electricity production since the beginning of the year: 1 954 497 MWh.