20. 2. 2006

Information on Dukovany NPP, February 20th 2006

Units 1,2,4 are operated at full rated power. Unit 3 is before the refueling outage so that it is operated with a lower power at a temperature and power effect. All auxiliary systems are working in accordance with operational needs of units. Electricity production since the beginning of operation: 253 946 261 MWh.

Information on parameters of Unit 1-4, today on February 20, 2006 at 7:00 hrs: Unit 1 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output - 450 MWe

Unit 2 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output - 447 MWe

Unit 3 is in Mode 1 – power conditions: Reactor power is 97%, Turbine generator output - 451 MWe

Unit 4 is in Mode 1 – power conditions: Reactor power is 100%, Turbine generator output - 450 MWe

Electricity production since the beginning of the year: 2 174 525 MWh.